Loading your session…

How the estimate works

For each selected mission, add its minimum or maximum typical time plus the preparation time you choose. Add those results across all selected runs. The extra minutes apply to every run, including the first; they are a planning allowance, not a measured queue time.

Lower total = Σ runs × (minimum + extra minutes)

Upper total = Σ runs × (maximum + extra minutes)

Single-mode capacity divides your budget by the same per-run totals and rounds down. A range that fits means it fits these estimates; disconnects, long queues and mission interruptions can still make it run over.

Read the whole duration range

Example plans and what the result means
Budget and allowanceSelected runsTotal rangeDecision
90 minutes; 5 extra per runTwo Blitz + one Siege65–95 minutesThe upper end exceeds the budget by five minutes
45 minutes; no extraOne Horde50–60 minutesEven the lower end is too long
20 minutes; no extraOne Blitz15–20 minutesThe upper end exactly fills the budget

Example plans and what the result means

90 minutes; 5 extra per run

Selected runs
Two Blitz + one Siege
Total range
65–95 minutes
Decision
The upper end exceeds the budget by five minutes

45 minutes; no extra

Selected runs
One Horde
Total range
50–60 minutes
Decision
Even the lower end is too long

20 minutes; no extra

Selected runs
One Blitz
Total range
15–20 minutes
Decision
The upper end exactly fills the budget

An empty selection has no missions to estimate. Add a run before reading the result as a session plan. If the lower end already exceeds your budget, reduce the selected counts or choose a shorter mode.

Use the plan with your squad

Read the mission objectives before choosing a mode, then match the class and difficulty recommendation to the role you want to practice. This tool does not score builds or predict success.

Leave room for the recovery and extraction sequence, especially when you are collecting Parts. Copying a plan link shares its inputs; it does not reserve a lobby or queue a match.